Dental clinic setup, end to endFrom bare walls to your first patient.

We design, build, equip, and launch dental clinics — floor plans, chairs and imaging, materials, licensing, and the website that fills your appointment book. One partner, A to Z.

  • Design & fit-out
  • Equipment & installation
  • Supplies & digital
  • 120+Clinics launched
  • 15Cities covered
  • 40+Partner brands
  • 24/7Technical support
What we do

Everything a new clinic needs. Under one roof.

Six service lines that take you from an empty unit to a fully running practice — without juggling ten contractors.

  • Clinic Design & Fit-Out

    Space that works as hard as you do

    Architectural layouts, interior design, and full construction supervision tuned to dental workflow — from sterilization loops to chair positioning.

    • AutoCAD floor plans & 3D visualization
    • Ergonomic operatory layout
    • Finishing, electrical & plumbing supervision
  • Equipment Supply & Installation

    The right machines, installed right

    Dental units, imaging, sterilization, and utilities from 40+ trusted brands — delivered, installed, calibrated, and backed by real warranties.

    • Dental units, CBCT & panoramic imaging
    • Installation, calibration & staff training
    • Genuine warranties & spare parts
  • Materials & Consumables

    Stocked before you need it

    Restorative, endodontic, prosthetic, and infection-control supplies with scheduled restocking so your drawers are never empty mid-treatment.

    • Full opening-day starter kits
    • Scheduled monthly restocking
    • Competitive bulk pricing
  • Websites & Digital Presence

    Be found. Be booked.

    A modern website with online booking, brand identity, and launch-ready social media — so patients find you the day you open.

    • Custom website & online booking
    • Logo & brand identity design
    • Social media launch kit
  • Licensing & Compliance

    Open with confidence

    We handle permits, syndicate registration, and infection-control protocols so your clinic passes inspection the first time.

    • Ministry & syndicate paperwork
    • Infection-control protocol setup
    • Safety & radiology compliance
  • Aftercare & Maintenance

    We stay after the ribbon is cut

    Preventive maintenance contracts, rapid repairs, and equipment upgrades that keep your clinic running without canceled appointments.

    • Preventive maintenance contracts
    • Rapid-response repairs
    • Trade-in & upgrade programs
How it works

Five steps from key handover to grand opening.

A clear, managed path — you always know what happens next and what it costs.

  1. 01

    Discover

    A site visit and a working session on your specialty, capacity, and budget. You get a scoped plan with transparent numbers.

  2. 02

    Design

    Floor plans, 3D renders, and an equipment list matched to your practice — revised with you until it fits.

  3. 03

    Build & Equip

    Fit-out crews and certified engineers execute the design; equipment arrives, gets installed, calibrated, and tested.

  4. 04

    Launch

    Licensing cleared, staff trained, website live, brand on the door. Your first patients can already book online.

  5. 05

    Grow

    Monthly supplies, maintenance visits, and digital support keep the clinic full and the equipment humming.

Equipment showcase

Hardware your patients can feel.

A curated catalog from the brands dentists actually ask for — installed and serviced by our own engineers.

  • Operatory

    Dental Units & Stools

    Ergonomic units with integrated delivery systems, LED lights, and matching operator stools.

  • Imaging

    CBCT & Panoramic X-Ray

    High-resolution 2D/3D imaging with low dose and instant chairside viewing.

  • Sterilization

    Class-B Autoclaves

    Vacuum autoclaves with traceable cycles that satisfy the strictest inspection.

  • Utility room

    Oil-Free Compressors & Suction

    Silent, dry, oil-free air and high-vacuum suction sized to your chair count.

  • Digital dentistry

    Intraoral Scanners & 3D Printers

    The latest scanning and in-house 3D printing technology — a complete digital workflow for every budget.

  • Cabinetry

    Customised Dental Cabinets

    Made-to-measure cabinetry for operatory and sterilization rooms — hygienic surfaces, smart storage.

  • Digital dentistry

    Scanner Trolleys

    Mobile carts that keep your intraoral scanner powered, protected, and chairside wherever you work.

  • Magnification

    Loupes & Microscopes

    Precision optics — dental loupes and operating microscopes for ergonomic, detail-perfect dentistry.

  • Endodontics

    Endo Motors & Apex Locators

    Precision rotary endo with integrated apex locating — our founding specialty.

Brands & service

Fona, Sirona, Adec, KaVo — supplied, installed, serviced.

We supply and install the equipment brands dentists trust, keep them running with certified maintenance, and stock genuine spare parts.

  • Fona
  • Sirona
  • Adec
  • KaVo
  • NuFona

Maintenance & spare parts

Our engineers handle Sirona maintenance and Fona maintenance in-house — scheduled service contracts, emergency repairs, and calibration — with genuine Sirona spare parts and Fona spare parts in stock. We also supply and service the full Fona dental unit range, including Fona N1, Fona N3, NuFona N1, and NuFona N3, alongside Adec and KaVo installations.

  • Sirona maintenance & genuine spare parts
  • Fona maintenance & genuine spare parts
  • Fona N1, Fona N3, NuFona N1 & N3 dental units
  • Adec & KaVo installation and service
Our previous work

Clinics we brought to life.

A look inside spaces we designed, built, and equipped for dentists across Egypt — from first sketch to first patient.

Reception & waiting lounge
Reception & waiting lounge
Branded operatory fit-out
Branded operatory fit-out
Boutique clinic interior
Boutique clinic interior
Implant clinic operatory
Implant clinic operatory
Color-forward treatment room
Color-forward treatment room
Twin-operatory build
Twin-operatory build
Lounge with living green wall
Lounge with living green wall
Modern operatory with custom cabinetry
Modern operatory with custom cabinetry
Why Healthcare Dental Solutions

Built by people who live inside clinics.

We are dentists and engineers, not resellers. Every recommendation comes from operating rooms we have equipped and mistakes we have already made for you.

  • Dentist-led decisions

    Equipment lists and layouts reviewed by practicing clinicians, not just sales sheets.

  • One accountable partner

    One contract, one timeline, one phone number — no finger-pointing between contractors.

  • Inspection-proof setup

    Licensing and infection-control done to standard, so you open on schedule.

  • Service after the sale

    Our engineers stay on call with maintenance contracts and genuine spare parts.

Who we are

Healthcare Dental Solutions is a Cairo-based company specialized in equipping dental clinics across Egypt from A to Z. We handle complete dental clinic setup: architectural design and fit-out, supply and installation of dental units and imaging from brands such as Fona, Sirona, Adec, and KaVo, materials and consumables, licensing and syndicate paperwork, and the website that brings in your first patients. Our engineers also provide ongoing maintenance and genuine spare parts for Sirona, Fona, and NuFona equipment, including the Fona N1 and N3 unit range. We have launched more than 120 clinics across 15 Egyptian cities, backed by 24/7 technical support from our office in Nasr City, Cairo. Whether you need a complete dental clinic built from scratch or a single operatory upgraded, one partner takes you from bare walls to your first patient.

Word of mouth

Dentists who opened with us

  • They handed me a clinic where the only thing missing was patients — and then the website they built brought those too. I signed one contract and opened in nine weeks.

    Dr. Sara El-MasryEndodontist · New Cairo
  • The layout they designed added a full extra operatory in the same square meters my architect said fits two. That room pays my rent now.

    Dr. Omar HassanProsthodontist · Alexandria
  • When my compressor failed on a Thursday night, their engineer was there Friday morning. That is the difference between a supplier and a partner.

    Dr. Nour AbdelrahmanPediatric Dentist · Mansoura
Questions

Before you ask

A typical single-operatory clinic takes 8–12 weeks from signed design to opening day, including fit-out, equipment installation, and licensing. Multi-chair clinics run 12–20 weeks.

Yes — we have launched clinics in 15 cities across Egypt and can mobilize fit-out and installation teams nationwide.

Absolutely. Every service line works standalone: equipment supply, monthly consumables, a website, or just the design drawings.

We partner with financing providers and offer staged payment schedules aligned to project milestones. Ask for a plan in your consultation.

Start with the space: a layout designed around clinical workflow, then fit-out, then equipment — dental unit, imaging, sterilization — then licensing, and finally your digital presence. Our five-step process covers all of it: we visit your site, design the clinic, build and equip it, clear the licenses, and launch you with a working website. One contract and one timeline instead of coordinating five contractors.

Yes. Our engineers provide maintenance for Sirona, Fona, NuFona, Adec, and KaVo equipment — scheduled service contracts, emergency repairs, and calibration — and we stock genuine spare parts for Sirona and Fona units, including the Fona N1 and N3 range.

Your clinic is one conversation away.

Book a free consultation — we will walk your site, scope your budget, and hand you a plan you can keep, whether or not you build with us.